0

High Voltage Batteries

Select BRAND

Select Volts

High Voltage Batteries are out of stock

Subscribe to updates – we'll let you know when High Voltage Batteries are back in stock. Normally, we update products every 2 weeks.

By clicking "Notify me", I agree by electronic signature to: (1) receive marketing and other texts and messages from A1 SolarStore, directly or from third parties acting on its behalf, at the email address I entered above; (2) the Terms and Conditions; and (3) the Privacy Policy.

Best High Voltage Batteries alternativesBest choice

In stock

Trojan Pacer P-105 LPT 220Ah 6V Deep-Cycle Flooded Battery Golf Cart & RV

  • AMP Hours220Ah
  • TypeLead Acid

Pickup on Tue, Feb 10 from Miami, FL

Delivery on Feb 09–12

In stock

Trojan Pacer P-875 LPT 165Ah 8V Deep-Cycle Battery Flooded Lead-Acid Golf Cart & Industrial Use

  • TypeLead Acid

Pickup on Tue, Feb 10 from Miami, FL

Delivery on Feb 09–12

In stock

Trojan Motive T-605 LPT 210Ah 6V Deep-Cycle Flooded Battery Golf Cart & Industrial

  • AMP Hours210Ah
  • TypeLead Acid

Pickup on Tue, Feb 10 from Orlando, FL

Delivery on Feb 09–12

In stock
Customer Choice

Trojan Motive T-105 LPT 225Ah 6V Deep-Cycle Flooded Battery Golf Cart & Solar

  • AMP Hours225Ah
  • TypeLead Acid

Pickup on Tue, Feb 10 from Ft. Myers, FL

Delivery on Feb 09–12

In stock

Trojan Motive T-875 EHPT 170Ah 8V Deep-Cycle Flooded Battery Golf Cart & Industrial

  • AMP Hours170Ah
  • TypeLead Acid

Pickup on Tue, Feb 10 from Tampa, FL

Delivery on Feb 09–12

In stock

Trojan Motive T-875 LPT 170Ah 8V Deep-Cycle Battery Golf Cart & Industrial Power

  • AMP Hours170Ah
  • TypeLead Acid

Pickup on Tue, Feb 10 from Ft. Myers, FL

Delivery on Feb 09–12

Limited stock

Pacer P-125 LPT 235Ah 6V Deep-Cycle Flooded Battery for Golf Carts, Floor Machines & Solar Systems

  • AMP Hours235Ah
  • TypeLead Acid

Pickup on Tue, Feb 10 from Miami, FL

Delivery on Feb 09–12

In stock

Trojan T105 LPT Mastervent 225Ah 6V Deep-Cycle Flooded Battery Golf Cart & Solar

    Pickup on Tue, Feb 10 from Miami, FL

    Delivery on Feb 09–12

    • Overview
    • Articles

    High Voltage Battery

    Systems operating above 400V deliver faster charging and reduced infrastructure costs while introducing critical engineering considerations. An 800V system charging at 250 kW draws 310 amps versus 625 amps for 400V—cutting cable costs and thermal management requirements by 40%.

    Cost-Performance Comparison by Voltage

    Voltage Current at 250kW Cable Cost Savings Cooling Cost Best For
    400V 625A Baseline Baseline Standard EV, Budget projects
    800V 310A -58% -40% Fast charging, Premium EV
    1000V 250A -71% -55% Grid storage, Industrial

    Battery Chemistry ROI Analysis

    LFP (Lithium Iron Phosphate) — Best total cost of ownership with 4,000-6,000 cycles and $95-110 per kWh. Ideal for commercial fleets and grid storage where longevity outweighs energy density.

    NMC (Nickel-Manganese-Cobalt) — Premium choice at 260 Wh/kg energy density for maximum range. Higher initial cost ($135-150/kWh) justified by performance requirements.

    Chemistry Cost per kWh Cycle Life Energy Density ROI Timeline
    LFP $95-110 4,000-6,000 170 Wh/kg Best for daily cycling
    NMC 811 $135-150 1,500-2,000 260 Wh/kg Premium applications
    NCA $140-155 1,000-1,500 270 Wh/kg Performance-critical

    Thermal Management Investment Guide

    Cooling systems directly impact operational costs and battery lifespan. A 100 kWh battery at 150 kW fast charging generates 7.5 kW waste heat—temperature control beyond 3-5°C degrades performance.

    Expert Tip

    Liquid cold plate cooling costs $35-55/kWh versus $15-25 for air cooling, but delivers 25-30% cycle life extension. ROI achieved within 18-24 months for applications exceeding 250 daily cycle-equivalents.

    Sergey Fedorov, Co-founder & CTO

    Cooling System Cost per kWh Cycle Life Gain Recommended Use
    Air cooling $15-25 Baseline Light-duty, <1C charging
    Liquid cold plate $35-55 25-30% Commercial fleets, fast charging
    Immersion $60-85 35-40% Extreme environments, ultra-fast

    Fast Charging Infrastructure Costs

    Higher voltage platforms reduce charging time and infrastructure investment. An 800V system enables 15-20 minute charging versus 25-35 minutes for 400V—critical for commercial operations minimizing downtime.

    Platform Charge Power Time (10-80%) Infrastructure Premium
    400V 150-200 kW 25-35 min Baseline
    800V 250-350 kW 15-20 min 30%
    1000V 350-500 kW 10-15 min 60%

    Application-Specific Voltage Selection

    Application Optimal Voltage Cycle Life Target Key Metric
    Passenger EV 400-800V 1,500-2,000 Energy density, range
    Commercial EV 600-800V 3,000-4,000 Fast charging, uptime
    Grid Storage 1,000-1,500V 4,000-6,000 Lowest LCOS
    Fast Charging Hub 800-1,000V N/A Peak power delivery

    End-of-Life Value Recovery

    A 75 kWh battery contains $3,000-5,000 in recoverable materials (lithium, nickel, cobalt). Advanced recycling processes recover 90-95% of cathode materials, creating secondary revenue streams.

    ♻️ Second-Life Strategy: Batteries degraded to 70-80% capacity serve grid applications where space isn't constrained, offsetting replacement costs by 25-35%.

    Expert Tip

    Establish certified recycler partnerships during initial procurement. Second-life applications can reduce total lifecycle costs by up to 35% for qualifying use cases.

    Sergey Fedorov, Co-founder & CTO

    2025-2028 Technology Investment Priorities

    Technology Market Ready Performance Impact Cost Impact
    Silicon anodes 2025-2026 25% energy density 15% initial
    Wireless BMS 2026-2027 30% assembly reduction -10% system
    Cell-to-pack Now 18% efficiency -8% per kWh

    Strategic Recommendations

    💼 Commercial Fleets & Grid Storage: LFP chemistry at 600-800V with liquid cooling delivers optimal lifecycle economics for applications exceeding 250 daily cycles annually.

    Premium & Performance Applications: NMC chemistry at 800V with active thermal management maximizes energy density. Establish second-life pathways to reduce replacement costs by 35%.

    Optimize Your Battery Investment Strategy

    Connect with our engineering team to evaluate which configuration delivers the best ROI for your operational requirements.

    Shop High Voltage Battery

    Stay tuned

    Free and usefull digest on solar energy. No spam

    By clicking "Subscribe", I agree by electronic signature to: (1) receive marketing and other texts and messages from A1 SolarStore, directly or from third parties acting on its behalf, at the email address I entered above; (2) the Terms and Conditions; and (3) the Privacy Policy.